v14: Tool drop needle-retract mechanism: 60 psi sweep, magnet hold study, v2d EPM latch drawing and CAD model with fit check, TOOLS.md update

Frozen Fri Oct 23, 2026, 10:42 AM ET · 7 files · folder: versions/v14_2026-10-23/

This snapshot is older than v21 and keeps notes and UI only; the large CAD, mesh and render files are no longer on this site.

What changed

New in this snapshot: 3 drawings, 0 STEP files, 0 documents/media.

Key decisions

Drawings new in v14

PDF

2026_10_23_grid_copper.svg
PDF

2026_10_23_grid_mask.svg
PDF

2026_10_23_resolution_pattern.svg
2026_10_23_OSSO_blank_v3b_preview_iso
2026_10_23_OSSO_blank_v3b_preview_iso
2026_10_23_preview_assembly_iso
2026_10_23_preview_assembly_iso
2026_10_23_preview_carrier_top
2026_10_23_preview_carrier_top
2026_10_23_preview_exploded_iso
2026_10_23_preview_exploded_iso
2026_10_23_preview_carrier_edge_iso
2026_10_23_preview_carrier_edge_iso
2026_10_23_preview_carrier_faceup_iso
2026_10_23_preview_carrier_faceup_iso
2026_10_23_preview_carrier_print_orientation
2026_10_23_preview_carrier_print_orientation
2026_10_23_YZD0029-20135-01_datasheet_drawing
2026_10_23_YZD0029-20135-01_datasheet_drawing
2026_10_23_YZD0029-20135-01_preview_12mm
2026_10_23_YZD0029-20135-01_preview_12mm
2026_10_23_datasheet_page3_200dpi
2026_10_23_datasheet_page3_200dpi
2026_10_23_lcsc_photo_front
2026_10_23_lcsc_photo_front
2026_10_23_preview
2026_10_23_preview
preview
preview
2026_10_23_align_proposal_v3a
2026_10_23_align_proposal_v3a
2026_10_23_ball_dispenser_poc_v1
2026_10_23_ball_dispenser_poc_v1
2026_10_23_ball_dispenser_poc_v2
2026_10_23_ball_dispenser_poc_v2
2026_10_23_ball_dispenser_poc_v3
2026_10_23_ball_dispenser_poc_v3
2026_10_23_ball_dispenser_poc_v4
2026_10_23_ball_dispenser_poc_v4
2026_10_23_ball_dispenser_poc_v5
2026_10_23_ball_dispenser_poc_v5
2026_10_23_card_edge_psu_companion_v1
2026_10_23_card_edge_psu_companion_v1
2026_10_23_jig_v4a_p1
2026_10_23_jig_v4a_p1
2026_10_23_jig_v4a_p2
2026_10_23_jig_v4a_p2
2026_10_23_osso_ball_dispenser_pneumatic_v1
2026_10_23_osso_ball_dispenser_pneumatic_v1
2026_10_23_osso_base_v2a
2026_10_23_osso_base_v2a
2026_10_23_osso_base_v2b
2026_10_23_osso_base_v2b
2026_10_23_osso_base_v2c
2026_10_23_osso_base_v2c
2026_10_23_osso_base_v2d
2026_10_23_osso_base_v2d
2026_10_23_osso_base_v2d_sym
2026_10_23_osso_base_v2d_sym
2026_10_23_osso_base_v2e
2026_10_23_osso_base_v2e
2026_10_23_osso_base_v2f
2026_10_23_osso_base_v2f
2026_10_23_osso_base_v2g
2026_10_23_osso_base_v2g
2026_10_23_osso_base_v2g2
2026_10_23_osso_base_v2g2
2026_10_23_osso_base_v2h
2026_10_23_osso_base_v2h
2026_10_23_osso_base_v2h2
2026_10_23_osso_base_v2h2
2026_10_23_osso_base_v2j
2026_10_23_osso_base_v2j
2026_10_23_osso_base_v2j2
2026_10_23_osso_base_v2j2
2026_10_23_osso_base_v2j3
2026_10_23_osso_base_v2j3
2026_10_23_osso_base_v2j4
2026_10_23_osso_base_v2j4
2026_10_23_osso_base_v2k
2026_10_23_osso_base_v2k
2026_10_23_osso_base_v2k2
2026_10_23_osso_base_v2k2
2026_10_23_osso_base_v2l
2026_10_23_osso_base_v2l
2026_10_23_osso_base_v2l_a
2026_10_23_osso_base_v2l_a
2026_10_23_osso_base_v2l_b
2026_10_23_osso_base_v2l_b
2026_10_23_osso_base_v2l_c
2026_10_23_osso_base_v2l_c
2026_10_23_osso_base_v2l_options
2026_10_23_osso_base_v2l_options
2026_10_23_osso_base_v2m
2026_10_23_osso_base_v2m
2026_10_23_osso_base_v2m_interposer
2026_10_23_osso_base_v2m_interposer
2026_10_23_osso_base_v2n
2026_10_23_osso_base_v2n
2026_10_23_osso_base_v2p
2026_10_23_osso_base_v2p
2026_10_23_osso_base_v2q
2026_10_23_osso_base_v2q
2026_10_23_osso_base_v2r
2026_10_23_osso_base_v2r
2026_10_23_osso_base_v2s
2026_10_23_osso_base_v2s
2026_10_23_osso_base_v2t
2026_10_23_osso_base_v2t
2026_10_23_osso_base_v2u
2026_10_23_osso_base_v2u
2026_10_23_osso_base_v3a
2026_10_23_osso_base_v3a
2026_10_23_osso_base_v3b
2026_10_23_osso_base_v3b
2026_10_23_osso_cell_concept_v1
2026_10_23_osso_cell_concept_v1
2026_10_23_osso_exploded_v2u
2026_10_23_osso_exploded_v2u
2026_10_23_osso_exploded_v2v_p1
2026_10_23_osso_exploded_v2v_p1
2026_10_23_osso_exploded_v2v_p2
2026_10_23_osso_exploded_v2v_p2
2026_10_23_osso_exploded_v3a_p1
2026_10_23_osso_exploded_v3a_p1
2026_10_23_osso_exploded_v3a_p2
2026_10_23_osso_exploded_v3a_p2
2026_10_23_osso_exploded_v3b_p1
2026_10_23_osso_exploded_v3b_p1
2026_10_23_osso_exploded_v3b_p2
2026_10_23_osso_exploded_v3b_p2
2026_10_23_osso_flux_syringe_head_v1
2026_10_23_osso_flux_syringe_head_v1
2026_10_23_osso_machine_cell_v1
2026_10_23_osso_machine_cell_v1
2026_10_23_osso_mains_companion_508_v1
2026_10_23_osso_mains_companion_508_v1
2026_10_23_osso_pnp_bed_n4_v1
2026_10_23_osso_pnp_bed_n4_v1
2026_10_23_osso_pnp_head_v1
2026_10_23_osso_pnp_head_v1
2026_10_23_osso_pnp_machine_v1
2026_10_23_osso_pnp_machine_v1
2026_10_23_osso_process_flow_v1
2026_10_23_osso_process_flow_v1
2026_10_23_osso_stack_side_v2u
2026_10_23_osso_stack_side_v2u
2026_10_23_osso_stack_side_v3a
2026_10_23_osso_stack_side_v3a
2026_10_23_osso_test_board_v1
2026_10_23_osso_test_board_v1
2026_10_23_osso_test_board_v2
2026_10_23_osso_test_board_v2
2026_10_23_osso_tool_drop_clean_poc_v1
2026_10_23_osso_tool_drop_clean_poc_v1
2026_10_23_osso_tool_drop_motion_sequence_v1
2026_10_23_osso_tool_drop_motion_sequence_v1
2026_10_23_osso_tool_drop_motion_sequence_v2
2026_10_23_osso_tool_drop_motion_sequence_v2
2026_10_23_osso_tool_drop_motion_sequence_v2b
2026_10_23_osso_tool_drop_motion_sequence_v2b
2026_10_23_osso_tool_drop_pneumatic_v1
2026_10_23_osso_tool_drop_pneumatic_v1
2026_10_23_osso_tool_drop_v2c_v1
2026_10_23_osso_tool_drop_v2c_v1
2026_10_23_osso_tool_drop_v2d_v1
2026_10_23_osso_tool_drop_v2d_v1
2026_10_23_osso_top_v1a
2026_10_23_osso_top_v1a
2026_10_23_osso_top_v1b
2026_10_23_osso_top_v1b
2026_10_23_osso_top_v1c
2026_10_23_osso_top_v1c
2026_10_23_osso_top_v1d
2026_10_23_osso_top_v1d
2026_10_23_osso_top_v1e
2026_10_23_osso_top_v1e
2026_10_23_osso_top_v1f
2026_10_23_osso_top_v1f
2026_10_23_osso_top_v1g
2026_10_23_osso_top_v1g
2026_10_23_osso_top_v1h
2026_10_23_osso_top_v1h
2026_10_23_osso_top_v1i
2026_10_23_osso_top_v1i
2026_10_23_psu_companion_fit_v1
2026_10_23_psu_companion_fit_v1
2026_10_23_psu_companion_fit_v2
2026_10_23_psu_companion_fit_v2
2026_10_23_psu_companion_fit_v3
2026_10_23_psu_companion_fit_v3
2026_10_23_psu_companion_fit_v4
2026_10_23_psu_companion_fit_v4
2026_10_23_stencil_frame_v1
2026_10_23_stencil_frame_v1
2026_10_23_wave_pot_v1
2026_10_23_wave_pot_v1
2026_10_23_wave_pot_v1_p2
2026_10_23_wave_pot_v1_p2
ball_dispenser_poc_v3
ball_dispenser_poc_v3
ball_dispenser_poc_v4
ball_dispenser_poc_v4
ball_dispenser_poc_v5
ball_dispenser_poc_v5
osso_ball_dispenser_pneumatic_v1
osso_ball_dispenser_pneumatic_v1
osso_cell_concept_v1
osso_cell_concept_v1
osso_process_flow_v1
osso_process_flow_v1
osso_tool_drop_clean_poc_v1
osso_tool_drop_clean_poc_v1
osso_tool_drop_motion_sequence_v1
osso_tool_drop_motion_sequence_v1
osso_tool_drop_motion_sequence_v2
osso_tool_drop_motion_sequence_v2
osso_tool_drop_motion_sequence_v2b
osso_tool_drop_motion_sequence_v2b
osso_tool_drop_pneumatic_v1
osso_tool_drop_pneumatic_v1
osso_tool_drop_v2c_v1
osso_tool_drop_v2c_v1
osso_tool_drop_v2d_v1
osso_tool_drop_v2d_v1
2026_10_23_GBL
2026_10_23_GBL
2026_10_23_GBO
2026_10_23_GBO
2026_10_23_GBS
2026_10_23_GBS
2026_10_23_GTL
2026_10_23_GTL
2026_10_23_GTO
2026_10_23_GTO
2026_10_23_GTS
2026_10_23_GTS
2026_10_23_composite_bot
2026_10_23_composite_bot
2026_10_23_composite_top
2026_10_23_composite_top
2026_10_23_drills_outline
2026_10_23_drills_outline
2026_10_23_sheet
2026_10_23_sheet
2026_10_23_silk_pair
2026_10_23_silk_pair
2026_10_23_zoom
2026_10_23_zoom
2026_10_23_OSSO_blank_v3b_preview_bot
2026_10_23_OSSO_blank_v3b_preview_bot
2026_10_23_OSSO_blank_v3b_preview_layers
2026_10_23_OSSO_blank_v3b_preview_layers
2026_10_23_OSSO_blank_v3b_preview_top
2026_10_23_OSSO_blank_v3b_preview_top
2026_10_23_grid_copper_preview
2026_10_23_grid_copper_preview
2026_10_23_grid_mask_preview
2026_10_23_grid_mask_preview
2026_10_23_resolution_pattern_preview
2026_10_23_resolution_pattern_preview
2026_10_23_br_g1_v1_preview
2026_10_23_br_g1_v1_preview
2026_10_23_preview_gerbv
2026_10_23_preview_gerbv
2026_10_23_br_g2_v1_preview
2026_10_23_br_g2_v1_preview
br_g2_v1_preview
br_g2_v1_preview
2026_10_23_designer_standoff_12mm_cad_2026-10-19
2026_10_23_designer_standoff_12mm_cad_2026-10-19
2026_10_23_tool_drop_magnet_hold_v1
2026_10_23_tool_drop_magnet_hold_v1
2026_10_23_tool_drop_pressure_sweep_v1
2026_10_23_tool_drop_pressure_sweep_v1
2026_10_23_tool_drop_toggle_check_v1
2026_10_23_tool_drop_toggle_check_v1
2026_10_23_2026-10-20_top_v1h_lower_center_SMT
2026_10_23_2026-10-20_top_v1h_lower_center_SMT
2026_10_23_PI_film_0075_order
2026_10_23_PI_film_0075_order
tool_drop_magnet_hold_v1
tool_drop_magnet_hold_v1
tool_drop_pressure_sweep_v1
tool_drop_pressure_sweep_v1
tool_drop_toggle_check_v1
tool_drop_toggle_check_v1
preview
preview
preview
preview
preview
preview
preview
preview
preview
preview
ball_dispenser_poc_v3
ball_dispenser_poc_v3
ball_dispenser_poc_v4
ball_dispenser_poc_v4
ball_dispenser_poc_v5
ball_dispenser_poc_v5
osso_ball_dispenser_pneumatic_v1
osso_ball_dispenser_pneumatic_v1
osso_cell_concept_v1
osso_cell_concept_v1
osso_process_flow_v1
osso_process_flow_v1
osso_tool_drop_clean_poc_v1
osso_tool_drop_clean_poc_v1
osso_tool_drop_motion_sequence_v1
osso_tool_drop_motion_sequence_v1
osso_tool_drop_motion_sequence_v2
osso_tool_drop_motion_sequence_v2
osso_tool_drop_motion_sequence_v2b
osso_tool_drop_motion_sequence_v2b
osso_tool_drop_pneumatic_v1
osso_tool_drop_pneumatic_v1
osso_tool_drop_v2c_v1
osso_tool_drop_v2c_v1
osso_tool_drop_v2d_v1
osso_tool_drop_v2d_v1
br_g2_v1_preview
br_g2_v1_preview
tool_drop_magnet_hold_v1
tool_drop_magnet_hold_v1
tool_drop_pressure_sweep_v1
tool_drop_pressure_sweep_v1
tool_drop_toggle_check_v1
tool_drop_toggle_check_v1

STEP files (0)

Documents & media

Journal entries in this version

2026-10-21 2:14 PM EDT — POC v3: stack the discs, set the gap with the hold-down screws

Oct 21, 2026 · 2:14 PM ET · journal ↗

the designer decided to stack the three BR-G1 discs directly in POC v3 and adjust the running gap by tightening the hopper's M2 hold-down screws until the middle disc turns freely. The kapton shim is a fallback only, used if the stack binds or rattles. A 0.25mm-thick disc isn't a problem, because a 0.25mm ball then sits flush and still can't pick up a second ball.

2026-10-21 2:16 PM EDT — Solder application roadmap: Kapton stencil first, ball tinning later

Oct 21, 2026 · 2:16 PM ET · journal ↗

the designer confirmed two solder application paths. Initial: a laser-cut Kapton paste stencil (stencil v2 track), ready to try once the laser is set up and aligned. Later: ball tinning, which is flux dots from the syringe head, then 0.25mm SAC305 balls from the BR-G1 dispenser, then reflow. It comes after the dispenser POC and flux head are proven. Both paths end in the same state, a board ready for flux and part placement, so the downstream steps (part tray, PnP, reflow, test) don't change between them.

2026-10-21 2:41 PM EDT — Ball dispenser POC v4: chute alignment fix + external BR-G1 drive gear (the designer's request)

Oct 21, 2026 · 2:41 PM ET · journal ↗

2026-10-21 5:03 PM EDT — Flux head serves two steps

Oct 21, 2026 · 5:03 PM ET · journal ↗

Decision (the designer): Keep selective flux. Whole-board flux was rejected because it means too much cleanup. The flux syringe head is needed twice: (1) a dot on each pad before solder ball tinning, and (2) a dot on each tinned pad before pick and place, to hold parts and wet the reflow. the designer plans a bench test of the manual ball dispenser with a flux dot to observe the physics: bounce, self-centering, and the dot size limit before bridging. References: EPTC 2012 tacky flux ball attach (doi 10.1109/eptc.2012.6507169), IRJMETS flip chip flux (doi 10.56726/irjmets33583).

2026-10-21 5:15 PM EDT — Post-reflow screen ahead of test

Oct 21, 2026 · 5:15 PM ET · journal ↗

2026-10-21 5:18 PM EDT — Purpose of solder ball drop (reminder)

Oct 21, 2026 · 5:18 PM ET · journal ↗

2026-10-21 5:20 PM EDT — Tinning enables pre-inspection and prep ahead

Oct 21, 2026 · 5:20 PM ET · journal ↗

the designer: Ball-drop tinning removes the stencil step (wasteful, a hassle, and a time saver once automated). Tinned boards can be automatically inspected (camera check of solid, domed pads, no bridges) and prepped ahead of time: tin a batch, inspect, and store until assembly. Defects are caught before parts are placed.

2026-10-21 9:52 PM EDT — Ball dispenser POC v5: two part types (BR-G2 FR4 carrier, BR-C1 stainless covers), printed D-spindle (the designer's request)

Oct 21, 2026 · 9:52 PM ET · journal ↗

2026-10-21 10:05 PM EDT — BR-C1 cover v2 for SendCutSend (304 SS .030", as cut, Ø0.80 hole)

Oct 21, 2026 · 10:05 PM ET · journal ↗

2026-10-21 10:19 PM EDT — BR-C1 v2 covers ordered

Oct 21, 2026 · 10:19 PM ET · journal ↗

the designer ordered BR-C1 v2 cover discs (br_c1_v2.dxf, 304 stainless .030", no finish) from SendCutSend, combined with a part for another project to reach the free-shipping minimum. Ship date TBD. On arrival: lap the ball face (400 to 1500 grit wet paper on glass), clear the Ø0.80 hole with a 0.7mm pin vise, and test with a 0.25 ball.

2026-10-22 9:29 AM EDT — XYZ head concept: folding tools (ideation)

Oct 22, 2026 · 9:29 AM ET · journal ↗

the designer wants a Swiss-army-knife style XYZ head where unused tools fold fully up and out of the way, leaving only the working needle below the head. Reason: even though components go on last, the head must work over a populated board for rework and parametric post-processing, so collisions with placed parts must be avoided. Standardize on Luer-lock blunt needles for replaceability (flux, PnP vacuum, ball pickup/drop, air, IPA spot-clean). Cameras on the head, plus an upward-looking camera for nozzle and tip calibration. Each tool needs a repeatable locked working position. Keep about 15–20mm of clearance under the head body for tall parts. Ideation only, so no drawings or models until the designer confirms.

2026-10-22 9:31 AM EDT — Ball drop exits through a Luer needle (ideation)

Oct 22, 2026 · 9:31 AM ET · journal ↗

Decision (the designer): The solder ball drop's last stage is a standard Luer-lock blunt needle, tentatively 23ga (~0.33 ID) for 0.25 balls, with 25ga borderline. Benefits: keeps the Luer standard and replaceability, guides the ball to the pad, and allows a low drop height for less bounce. Mitigations: air assist or tap to clear sticking, a grounded needle for static, a tip gap above the flux dot (or an air purge) to stop flux wicking, and camera or optical drop confirmation. Revisit the ball dispenser model to add the needle exit when we generate drawings and models.

2026-10-22 9:31 AM EDT — Air puff seats the ball (ideation)

Oct 22, 2026 · 9:31 AM ET · journal ↗

the designer: The air puff does two jobs. It clears the needle, and it seats the ball into the tacky flux dot to reduce bounce and rolling. Keep the pulse short and gentle so it doesn't blow the ball off the pad or splash the flux. Tune it on the bench.

2026-10-22 9:32 AM EDT — Shared vacuum/pressure utility (ideation)

Oct 22, 2026 · 9:32 AM ET · journal ↗

the designer: The vacuum/pressure system needed for pick and place becomes a shared head utility for all needle tools: PnP pick (vacuum) and place (blow-off), ball-drop air puff, clean (air blow-off, vacuum pickup of debris or excess flux), and others. Architecture: one pump/reservoir with a solenoid valve per tool line, so new needle tools only add a valve.

2026-10-22 9:33 AM EDT — Folding enables per-deploy Z calibration (ideation)

Oct 22, 2026 · 9:33 AM ET · journal ↗

the designer: A design benefit of the folding head is that each tool unfolds into the same working position, so a Z touch-off calibration on the deployed tip handles tip-length differences. There's no per-tool offset table, and swapped needles are simply re-probed.

2026-10-22 9:35 AM EDT — Flux reservoir rides on the head (ideation)

Oct 22, 2026 · 9:35 AM ET · journal ↗

the designer accepts carrying the flux on the head. Tacky gel flux doesn't push well through long hoses (pressure, line stretch, ooze), so a small 3–5cc syringe sits a few cm above the tip. It is driven by time-pressure air from the shared pressure system (long air line OK) with suck-back, keeping the flux path short. Estimated added mass is roughly 10–20g. Mount it near the gantry centerline.

2026-10-22 9:36 AM EDT — Solder ball reservoir rides on the head (ideation)

Oct 22, 2026 · 9:36 AM ET · journal ↗

the designer: Like the flux, the solder ball hopper and disc dispenser ride on the head directly above the Luer needle exit. Hoses are unreliable for balls (jams, static, inconsistent single-ball feed). Mass is small: 100k 0.25mm balls are about 6g, plus the compact dispenser body.

2026-10-22 9:36 AM EDT — Cleaner delivered by hose (ideation)

Oct 22, 2026 · 9:36 AM ET · journal ↗

the designer: Cleaning fluid (IPA) can come by hose from a frame-mounted reservoir, with only a small valve near the needle. Low viscosity and loose volume needs make a long hose fine. Use IPA-compatible tubing and seals (PTFE/FEP).

2026-10-22 9:37 AM EDT — Air dry after clean (ideation)

Oct 22, 2026 · 9:37 AM ET · journal ↗

the designer: After an IPA spot clean, the shared pressure line can air-dry the area. IPA flashes off quickly, so this needs no extra hardware and avoids a wait before the next step.

2026-10-22 9:38 AM EDT — Design note: farm model (high level)

Oct 22, 2026 · 9:38 AM ET · journal ↗

2026-10-22 9:40 AM EDT — Reflow: heated bed + hot-air Luer needle (ideation)

Oct 22, 2026 · 9:40 AM ET · journal ↗

Decision (the designer): Reflow uses a heated bed under the board (~120–150°C preheat) plus a point-by-point hot-air tool on the head, delivered through a large-gauge, full-metal Luer needle (stainless needle and stainless Luer hub, since plastic hubs soften). Heat points come from the design file (known pads), similar to REFLO Air XY Table's preheat, solder, and cooldown point list (https://www.hackster.io/ebaera/reflo-air-xy-table-812cd7). The hot-air controller can follow open PID designs (e.g. https://github.com/snivasms/SMD-Rework-Station). Add a heat break between the hot tool and the folding mount.

2026-10-22 9:42 AM EDT — Laser integration: gantry runs under the galvo (ideation)

Oct 22, 2026 · 9:42 AM ET · journal ↗

Decision (the designer): The galvo laser is fixed overhead and the gantry carries the board into its field, so laser operations happen inside the same machine. The head parks outside the galvo field while lasing. Planning items: limited galvo field (often 70–110mm with F-theta), so larger boards shift and stitch by fiducials found with the head camera; fixed focal distance, so the board must sit at a known Z (bed Z adjustment or touch-probe height); folded head and hoses kept out of the beam path; laser-to-gantry offset calibrated by marking a test pattern and finding it with the head camera; enclosure with a laser-rated window, interlock, and fume extraction at the galvo; no lasing while the heated bed is at reflow temperature (operation order).

2026-10-22 9:47 AM EDT — Single-machine scope decisions (ideation)

Oct 22, 2026 · 9:47 AM ET · journal ↗

Decisions (the designer): Test stays a separate station. A second side is done by a manual board flip. Conformal coating is manual. The laser can mark the board at any time and may assist with supplemental ablation steps (TBD). Parts tray concept: one carrier plate holding the blank and parts, registered on dowels at the tooling hole and slot, loaded in and an assembled board out. Next topic: through-hole pads.

2026-10-22 9:50 AM EDT — Solder is applied as preforms (ideation)

Oct 22, 2026 · 9:50 AM ET · journal ↗

Decision (the designer): All solder in the automated flow is applied as measured preforms. Solder balls are the smallest preform, for SMD pads. Washer or ring preforms (tape and reel, picked by the same PnP vacuum needle) go on through-hole pins to supply barrel-fill volume. TH sequence: flux dot (or flux-cored preform), preform, insert part, reflow. There is no paste in the automated flow (the Kapton paste stencil remains the initial manual path). Pin-in-paste by needle is a fallback; hand soldering stays for heat-sensitive or large TH parts.

2026-10-22 9:56 AM EDT — Parts tray setup is a separate station (ideation)

Oct 22, 2026 · 9:56 AM ET · journal ↗

the designer: Loading the parts tray/carrier is a different machine from the main single-machine cell. The prepped carrier (blank plus parts on dowel-registered plate) drops into the main machine. This fits the farm model: one tray-setup station can feed several machines and keeps the main cell busy on long jobs.

2026-10-22 9:56 AM EDT — Kit loads with the blank (ideation)

Oct 22, 2026 · 9:56 AM ET · journal ↗

the designer: The prepared kit (parts carrier/tray) goes into the machine together with the blank before job start. One load, then the job runs unattended to a fully assembled board (single side).

2026-10-22 9:57 AM EDT — Job order: laser the bottom first, then flip (ideation)

Oct 22, 2026 · 9:57 AM ET · journal ↗

the designer: Parts go on the top side, so the first step is lasing the bottom side of the bare blank, then a manual flip. All remaining operations (top laser, flux, ball drop, tin inspection, reflow, flux, PnP, reflow, clean) run on the top side, so populated parts never rest on the bed. The flip happens before the kit/blank job runs unattended, or as an early pause in the job.

2026-10-22 9:58 AM EDT — Two job types: bottom and top (decision)

Oct 22, 2026 · 9:58 AM ET · journal ↗

the designer: The machine runs two job types. Bottom job: bare blank only, laser the bottom side, then alert the operator. The operator flips the board, loads the parts tray/kit, and starts the top job. Top job: top laser, flux, ball drop, tin inspection, reflow, flux, PnP, reflow, clean, all unattended. The parts tray is only needed for the top job.

2026-10-22 9:59 AM EDT — Bottom and top jobs can run on different machines (decision)

Oct 22, 2026 · 9:59 AM ET · journal ↗

the designer: Bottom and top jobs don't have to run on the same machine. Each machine does its own job alignment check at job start (dowel registration plus a camera fiducial find, and probing where needed), so a board can move between farm machines between jobs.

2026-10-22 10:02 AM EDT — Concept drawings: single-machine cell + process flow (the designer's request)

Oct 22, 2026 · 10:02 AM ET · journal ↗

2026-10-22 10:59 AM EDT: Cell size TBD; machines as a possible business line

Oct 22, 2026 · 10:59 AM ET · journal ↗

the designer confirmed that the overall size of the single-machine cell is TBD. The ~480 W x 420 D x 560 H mm and ~200 mm carrier figures in osso_cell_concept_v1 are placeholders only. He also noted that OSSO may have a business side in building and selling these machines, alongside the PCB kits.

2026-10-22 11:02 AM EDT: Tool-drop actuation and lock options

Oct 22, 2026 · 11:02 AM ET · journal ↗

Option A (chosen for fast tool changes; to be drawn as a cross section): each folding tool has a tiny single-acting pneumatic cylinder (about 6-10 mm bore) or bellows fed from the shared valve bank, which pushes the tool lever down. A spring detent or over-center toggle locks it against a hard stop (the repeatable tip position, checked by Z touch-off), so it holds if air is lost. A small unlock puff releases the detent, and a return spring folds the tool up. Up is the safe state when nothing is powered. A reed or Hall sensor on each tool confirms which tool is deployed.

Option B (logged as an alternative): no cylinder. The gantry pushes the tool lever against a fixed post at the edge of the bed, like a 3D-printer tool changer, and air is used only for the unlock. It is lighter, but each change takes a few seconds.

2026-10-22 11:05 AM EDT: Concept drawing: pneumatic tool drop (Option A)

Oct 22, 2026 · 11:05 AM ET · journal ↗

2026-10-22 11:08 AM EDT: Tool drop drawing: part sources

Oct 22, 2026 · 11:08 AM ET · journal ↗

2026-10-22 11:12 AM EDT: Cleaning needle is the base tool for the first tool-drop prototype (decision)

Oct 22, 2026 · 11:12 AM ET · journal ↗

the designer: The first tool-drop prototype uses the IPA cleaning needle as its tool. It is the simplest tool (hose-fed, no reservoir, metering or heat). The early risk to test is the IPA and air hoses flexing at the pivot. The PoC is a single tool station cycled on a regulated compressed air feed, built so we can try it.

2026-10-22 11:14 AM EDT: Concept drawing: cleaning-needle tool-drop PoC

Oct 22, 2026 · 11:14 AM ET · journal ↗

2026-10-22 1:48 PM EDT – Tool drop mechanical PoC v1 (CadQuery)

Oct 22, 2026 · 1:48 PM ET · journal ↗

2026-10-22 1:53 PM EDT: Tool-drop PoC build added to TODO

Oct 22, 2026 · 1:53 PM ET · journal ↗

2026-10-22 1:56 PM EDT: Purpose of the mechanical tool-drop test

Oct 22, 2026 · 1:56 PM ET · journal ↗

the designer framed the mechanical-only tool-drop PoC (TODO 19a) as the feasibility test for needle retract: proving that a needle tool can deploy, lock, unlock and fold back up reliably on air alone before anything else is added to the head.

2026-10-22 2:59 PM EDT – Ball dispenser pneumatic index v1 drawing

Oct 22, 2026 · 2:59 PM ET · journal ↗

2026-10-22 5:17 PM EDT: Pneumatic ball dispenser ratchet decision

Oct 22, 2026 · 5:17 PM ET · journal ↗

the designer chose the 24-tooth printed ratchet for osso_ball_dispenser_pneumatic_v1. Each pulse is 15 degrees (2.62 mm pawl travel, 3.0 mm cylinder stroke to a hard stop). The fill stays aligned with a pocket at rest, and one ball drops every two presses (fill pulse, then exit pulse).

2026-10-22 5:27 PM EDT – Ball dispenser pneumatic index v1 CAD

Oct 22, 2026 · 5:27 PM ET · journal ↗

2026-10-22 5:33 PM EDT – Tool-drop mech PoC motion sequence annotation

Oct 22, 2026 · 5:33 PM ET · journal ↗

2026-10-22 5:52 PM EDT – Tool-drop mech PoC v1: linkage past dead center at folded rest (CAD not changed)

Oct 22, 2026 · 5:52 PM ET · journal ↗

2026-10-22 6:52 PM EDT – Tool-drop mech PoC v2 (option B) and kinematic checks

Oct 22, 2026 · 6:52 PM ET · journal ↗

2026-10-22 7:46 PM EDT – Tool-drop v2b: torsion return spring and side detent

Oct 22, 2026 · 7:46 PM ET · journal ↗

2026-10-23 7:35 AM EDT: Tool drop v2c notes (guide bearings for the pistons)

Oct 23, 2026 · 7:35 AM ET · journal ↗

the designer wants guide bearings for the pistons on the tool drop concept. This is notes only. Do not draw or model until he gives the command.

Plan for v2c, based on v2b:

2026-10-23 7:40 AM EDT: Tool drop v2c direction: single double-acting piston, 30 psi design point

Oct 23, 2026 · 7:40 AM ET · journal ↗

the designer decided to design the tool drop system against 30 psi. Direction for v2c (notes only; no drawing or model until he gives the command):

2026-10-23 7:43 AM EDT: Design note: all metric, minimize fastener sizes

Oct 23, 2026 · 7:43 AM ET · journal ↗

the designer set a design rule for OSSO: everything is metric, and the number of different fastener sizes is kept to a minimum. For the tool drop v2c this means M5 instead of 10-32 for the cylinder port threads, with metric push-to-connect fittings and tube (for example 4 mm OD instead of 1/8 inch), and reducing the M2/M3 screws and pins to as few sizes as possible. The earlier 10-32 ball plunger and 1/8 inch tube choices get replaced with metric equivalents when v2c is modeled. Notes only until the designer gives the drawing/model command.

2026-10-23 7:44 AM EDT: Design note: fasteners limited to M5 and M3

Oct 23, 2026 · 7:44 AM ET · journal ↗

the designer wants everything in M5 and M3 only. For the tool drop v2c this means: M5 for the cylinder ports and large threads, M3 for all screws and tapped holes, and no M2 or 10-32. Pins and dowels should be sized to match (3 mm), and the metric ball plunger should use M5 or M3 thread. Notes only until the designer gives the drawing/model command.

2026-10-23 7:44 AM EDT: Design note: exceptions to the M5/M3 rule

Oct 23, 2026 · 7:44 AM ET · journal ↗

the designer allows exceptions to the M5 and M3 only rule. Specialty hardware that is only available in imperial sizes needs his approval before it goes into a design. Specialty hardware in other metric thread sizes (for example M4, M6 or fine-pitch) is fine without asking. Notes only until the designer gives the drawing/model command.

2026-10-23 8:02 AM EDT: Tool drop v2c concept drawing v1 (drawing only)

Oct 23, 2026 · 8:02 AM ET · journal ↗

Made drawings/osso_tool_drop_v2c_v1.py/.png/.pdf (no CAD or model changes; cad/ untouched; no sync). House style: numbered callouts, notes table with a Source column, overall dims only, title block. Shows the section folded and deployed (view from +X), a pneumatic schematic (regulator and gauge at 30 psi, 4/2 valve, cap and rod-side lines, exhaust), the notes table and a force/torque summary. Dimensions approximate; friction values are estimates.

2026-10-23 8:25 AM EDT: Tool drop v2c pressure sweep (calculation only, sim/tool_drop_pressure_sweep_v1/tool_drop_pressure_sweep_v1.md/.png)

Oct 23, 2026 · 8:25 AM ET · journal ↗

2026-10-23 8:29 AM EDT - Tool drop: 60 psi set, plunger elimination

Oct 23, 2026 · 8:29 AM ET · journal ↗

the designer set 60 psi as the target (50 psi floor); compressor innovation later. Imperial springs approved in all cases. He wants the latch plunger eliminated. Options offered: (1) pneumatic hold with cap pressure, fail-safe fold by torsion spring; (2) over-center toggle against hard stop; (3) magnet detent; (4) printed flexure snap. Recommended 2 plus 1; 3 as fallback. Pending his choice; force/torque check on option 2 proposed. No drawing or model work.

2026-10-23 8:30 AM EDT - Tool drop: over-center toggle chosen

Oct 23, 2026 · 8:30 AM ET · journal ↗

the designer agreed on option 2 (over-center toggle against hard stop) as the lock, replacing the plunger. Option 1 (air hold) rejected as too risky. Starting force/torque check on the toggle (calculation only, no drawing or model).

2026-10-23 8:49 AM EDT - Tool drop: over-center toggle check result

Oct 23, 2026 · 8:49 AM ET · journal ↗

Calculation only (sim/tool_drop_toggle_check_v1/tool_drop_toggle_check_v1.md/.png). Verdict: toggle NOT feasible on the v2c geometry at 60 psi. Moment arm negative through the whole sweep (no over-center at deployed position; tail pin would need to move about 64-68 deg). Tolerance stack on past-center angle +-4 deg worst case. Rod-side release margin never above 0.71; hold/release window empty. Fallback: magnet detent, window 47-76 Nmm (aim about 60). Flag: a 2 N tip push at an assumed 40 mm lever (80 Nmm) exceeds that window, so no passive latch can both hold it and release; needs a decision on whether it is a real requirement.

2026-10-23 9:01 AM EDT - Tool drop: digital-control magnet hold

Oct 23, 2026 · 9:01 AM ET · journal ↗

the designer wants a magnet hold with digital control (latching electromagnet: permanent magnet plus coil pulse that cancels the pull). Feasibility can include it, but first tests stay simple: plain permanent magnet detent at about 60 N*mm. Calculation/notes only; no drawing or model.

2026-10-23 9:22 AM EDT - Tool drop: magnet hold sizing (calculation and research, no drawing/model)

Oct 23, 2026 · 9:22 AM ET · journal ↗

sim/tool_drop_magnet_hold_v1/tool_drop_magnet_hold_v1.md/.png. Plan A (first tests): two supermagnete S-06-03-N discs (6x3 mm N45), face to face, 12 mm lever, gap about 0.92 mm for about 60 Nmm; hold margin 1.90 vs spring, release 1.94 at 60 psi (1.63 at 1.5x friction); do not run below about 45 psi; M3 screw gap tuning (0.5 mm/turn, about 19 Nmm). Plan B (later, digital): electropermanent holding magnet (Hyab 71-1212-24-JSK first, 71-1811-24-JSK if the tip push must be held) driven by GPIO + MOSFET + flyback; release pulse 0.2-0.3 s after rod pressure. Open: whether a 2 N tip push at 40 mm lever (80 N*mm) is a real load (no passive magnet can hold it and release), lever length, stop block room, 12 vs 24 V, M3 screw access, magnet shop. Pull model needs a gauge check (+-15

2026-10-23 9:27 AM EDT - Tool drop: magnet hold sizing result and Plan B decision

Oct 23, 2026 · 9:27 AM ET · journal ↗

Magnet hold sizing (calculation and research only; sim/tool_drop_magnet_hold_v1/tool_drop_magnet_hold_v1.md/.png). Plan A: two supermagnete S-06-03-N discs, 12 mm lever, gap about 0.92 mm for about 60 Nmm; hold 1.90, release 1.94 at 60 psi; not below about 45 psi. Plan B: electropermanent holding magnet, release pulse 0.2-0.3 s via GPIO + MOSFET + flyback. the designer chose Plan B with hold against the 2 N tip push (Hyab 71-1811-24-JSK, 24 V, about 270 Nmm), simple manual test electronics, and commanded the v2d drawing next (drawing only). Open: 40 mm lever, stop block room (3-8 mm deeper), supplier, mount.

2026-10-23 9:45 AM EDT - Tool drop v2d concept drawing delivered (drawing only, not modeled)

Oct 23, 2026 · 9:45 AM ET · journal ↗

drawings/osso_tool_drop_v2d_v1.py/.png/.pdf. Electropermanent latch (Hyab 71-1811-24-JSK) replaces the plunger; folded/deployed sections, latch detail, 60 psi pneumatic schematic, manual test electronics (24 V, pushbutton, flyback diode, optional PTC, later GPIO + MOSFET), force/torque panel (hold 270 N*mm, release capability 116.4, spring 31.6, tip push 80), notes table with Source column and open items. Overall about 115 mm long and 48 mm tall (was 36); stop block about 6 mm deeper. Flags: stop dowel moved to Z -23.5; EPM envelope may interfere with rod/clevis when deployed (CAD check); block needs about 21 mm X by 24 mm Z; armature must stand 1 mm proud; deploy margin needs re-check without the plunger; regulator/valve/fittings rated 100 psi or more; fitting 5225K647 is straight but drawn as elbow. Many part numbers unverified.

2026-10-23 10:42 AM EDT - Tool drop v2d CAD model (cad/tool_drop_mech_poc_v2d)

Oct 23, 2026 · 10:42 AM ET · journal ↗

2026-10-23 10:42 AM EDT - VERSION v14 snapped

Oct 23, 2026 · 10:42 AM ET · journal ↗

Milestone: the tool-drop needle-retract mechanism has a full CAD model. Frozen to project/versions/v14_2026-10-23 + OSSO_v14_2026-10-23.tar.gz (the project without versions/, project/export/video/, stray root tarballs and ._* files; project/refs/TOOLS.md copied to the version root). Since v13: tool drop PoC v1 to v2b (torsion spring, plunger), v2c drawing and 60 psi pressure sweep, over-center toggle check (not feasible), magnet hold sizing, v2d concept drawing (electropermanent latch), and the v2d CAD model with BOM and interference/kinematics fit check (cad/tool_drop_mech_poc_v2d); TOOLS.md updated (pyvista, trimesh, BRepExtrema, sweep technique, SendCutSend plate). The docs site now lists v14. Mac sync excludes versions/ and project/export/video/ as before.