OSSO

← Oct 29 Oct 31 →

Journal: Friday, Oct 30, 2026

  1. 2026-10-30 8:10 AM: TH pin-in-paste design session
  2. 2026-10-30 10:35 AM EDT: Head v5, N6 r5, syringe recommendation
  3. 2026-10-30 1:15 PM EDT: T_HOME_LOW_MIN enforced
  4. 2026-10-30 1:35 PM EDT: machine motion animation r3 (run 17 rules, head v5)
  5. 2026-10-30 2:30 PM EDT: twin tray + X rework plan (option C, plan only)
  6. 2026-10-30 4:15 PM EDT: run 18 twin tray + GT2 belt X built in CAD
  7. 2026-10-30 (EDT): heater plate TH grid study + interposer r5c lattice
  8. 2026-10-30 4:46 PM EDT: Snap v21
  9. 2026-10-30: blanks r2 (v1o, v3f) and heater plate v1
  10. 2026-10-30: heater plate v2 and v1o card CAD

2026-10-30 8:10 AM: TH pin-in-paste design session

Oct 30, 2026 · 8:10 AM ET · #

Decisions and notes captured in project/docs/th_pin_in_paste.md: station order N1 ball, N2 flux, N3 IPA, N4/N5 PnP, N6 paste auger on the needle; cartridges for ball and paste; paste for TH and large pads, balls for small; bottom side traces only, preheated; the trace designer optimizes for reflow parameters after testing. Head v5 waits for go.

2026-10-30 10:35 AM EDT: Head v5, N6 r5, syringe recommendation

Oct 30, 2026 · 10:35 AM ET · #

2026-10-30 1:15 PM EDT: T_HOME_LOW_MIN enforced

Oct 30, 2026 · 1:15 PM ET · #

2026-10-30 1:35 PM EDT: machine motion animation r3 (run 17 rules, head v5)

Oct 30, 2026 · 1:35 PM ET · #

2026-10-30 2:30 PM EDT: twin tray + X rework plan (option C, plan only)

Oct 30, 2026 · 2:30 PM ET · #

2026-10-30 4:15 PM EDT: run 18 twin tray + GT2 belt X built in CAD

Oct 30, 2026 · 4:15 PM ET · #

2026-10-30 (EDT): heater plate TH grid study + interposer r5c lattice

Oct 30, 2026 · #

2026-10-30 4:46 PM EDT: Snap v21

Oct 30, 2026 · 4:46 PM ET · #

2026-10-30: blanks r2 (v1o, v3f) and heater plate v1

Oct 30, 2026 · #

2026-10-30: heater plate v2 and v1o card CAD

Oct 30, 2026 · #